Removal of old Slate Tile Roof and Replacement with new metal roof 3 weeks to complete  PICTURE 2

We offer a wide range of remodeling, construction and maintenance services.  Over the years Temple Real Estate Development have created and implemented specific approach's to ensure that customers are satisfied with the work that has been done no matter the job size. We guarantee the highest quality craftsmanship, fairly priced labor, and a team dedicated to meeting completion times on schedule.    

Picture 1


Removal of Builder's Composite Cedar Shake 

Application of Exterior Grade Stone Mortar and Installation of Cultured Stone and Match Grout

CUSTOM WOOD WORKING AND TRIM

DECK REBUILD IN CANTON OHIO

Took Old deck off to foundation and re-built steps , new framing, and refinished with new decking boards

poured new sidewalk and custom concrete steps 2 days to complete


VAULT ROOM AT 797 BUILDING  

Old laundry room area at 797 Building, and mounted vault door from Fair Finance building in center of room and fine finished to create "vault room" at Alexander Pierce Restaurant" 


CUSTOM METAL ROOFING PROJECT


DRYWALL HANGING AND FINISHING

Refinished living room after flood, completed in 3 weeks

The finished "Vault Room" at Alexander Pierce Restaurant , within the 797 Building in downtown Akron.  4 weeks to complete

HARDWOOD FLOORING PROJECT 

Tear up of old carpet and install of 2000 square feet of traditional hardwood flooring 2 weeks to complete 

Below are some of our most recent pictures of different jobs preformed in various areas of expertise, If interested in these or any other construction or remodeling services please submit an inquiry form located in the "contact us" page or contact us directly.

DRYWALL HANGING AND FINISHING

Take down of old textured ceiling and flat finish drywall 5 days to complete 

DRAIN AND SUPPLY PLUMBING


Removal of old Slate tile Roof and 

Replacement with new metal roof 3 weeks to 

complete  PICTURE 1

CONCRETE SIDEWALK AND STEPS


CUSTOM BACK SPALSH AND TILE

Removal of old tile and refinished, 1 week to compelte

CONCRETE AND BRICK WORK

FRAMING AND ROUGH CARPENTRY

New addition competed in 7 weeks , Summer of 2020

Demolition of exiting commercial interior and Re-Frame in Steel Steel Stud 9,000 Sq Feet 

Picture 2

MORE CONCRETE SIDEWALKS

New plumbing under addition to house 1 week to complete


FINE CARPENTRY AND FINISHING

Removal of old mantel, New Fireplace surround and Cabinets 4 weeks to compete

Temple Construction Services 

Removal of old Broken Side Walks and Pour of New Sidewalks , Aprox 150 feet of Side walk with install of Gutter Drains and French Drains

STEEL STUD INTERIOR FRAMING  

 R E A L   E S T A T E    D E V E L O P M E N T   &   M A N A G E M E N T 

Removal of old wall paper and flooring and install of new 3/4 inch real hardwood floors, added double box wood coffered wall panels with chair rail topping and ornamental onlays 

EXTERIOR STONE PROJECT

VAULT ROOM AT 797 BUILDING  

removal of old sidewalk by jackhammer and setting of new sidewalk 5ft by 22ft and replacement of foundation bricks to match

2 days to complete

CUSTOM METAL ROOF PROJECT