Removal of old Slate Tile Roof and Replacement with new metal roof 3 weeks to complete PICTURE 2
We offer a wide range of remodeling, construction and maintenance services. Over the years Temple Real Estate Development have created and implemented specific approach's to ensure that customers are satisfied with the work that has been done no matter the job size. We guarantee the highest quality craftsmanship, fairly priced labor, and a team dedicated to meeting completion times on schedule.
Picture 1
Removal of Builder's Composite Cedar Shake
Application of Exterior Grade Stone Mortar and Installation of Cultured Stone and Match Grout
Took Old deck off to foundation and re-built steps , new framing, and refinished with new decking boards
poured new sidewalk and custom concrete steps 2 days to complete
Old laundry room area at 797 Building, and mounted vault door from Fair Finance building in center of room and fine finished to create "vault room" at Alexander Pierce Restaurant"
Refinished living room after flood, completed in 3 weeks
The finished "Vault Room" at Alexander Pierce Restaurant , within the 797 Building in downtown Akron. 4 weeks to complete
Tear up of old carpet and install of 2000 square feet of traditional hardwood flooring 2 weeks to complete
Below are some of our most recent pictures of different jobs preformed in various areas of expertise, If interested in these or any other construction or remodeling services please submit an inquiry form located in the "contact us" page or contact us directly.
Take down of old textured ceiling and flat finish drywall 5 days to complete
Removal of old Slate tile Roof and
Replacement with new metal roof 3 weeks to
complete PICTURE 1
Removal of old tile and refinished, 1 week to compelte
New addition competed in 7 weeks , Summer of 2020
Demolition of exiting commercial interior and Re-Frame in Steel Steel Stud 9,000 Sq Feet
Picture 2
New plumbing under addition to house 1 week to complete
Removal of old mantel, New Fireplace surround and Cabinets 4 weeks to compete
Removal of old Broken Side Walks and Pour of New Sidewalks , Aprox 150 feet of Side walk with install of Gutter Drains and French Drains
R E A L E S T A T E D E V E L O P M E N T & M A N A G E M E N T
Removal of old wall paper and flooring and install of new 3/4 inch real hardwood floors, added double box wood coffered wall panels with chair rail topping and ornamental onlays
removal of old sidewalk by jackhammer and setting of new sidewalk 5ft by 22ft and replacement of foundation bricks to match
2 days to complete